TISKI: 64-Screen Retrofit
FEATUREDTISKI: 64-Screen RetrofitTrabzon, Türkiye
TISKI: 64-Screen Retrofit
TISKI: 64-Screen Retrofit · Türkiye
Drinking Water · 2019-2020

TISKI: 64-Screen Retrofit

Custom design | 64 screens

The first use of Coanda screens for drinking water in the Trabzon region. ADENCO worked with TISKI (Trabzon Water and Sewerage Administration) to modernise 64 ageing drinking water intake structures serving 64 separate settlements, retrofitting them with Coanda screens in two stages.

64Intake Screens
2 stagesDelivery
Rwanda Hydropower: Kigasa
Rwanda Hydropower: Kigasa · Rwanda
Hydropower · 2019

Rwanda Hydropower: Kigasa

Custom design | 850 l/s (screen capacity)

A custom production batch: non-standard dimensions, heavier construction for extreme site conditions, and protection bars against large debris (stainless steel bars mounted in front of the wedge wire that take the impact of rocks and timber). From order to dispatch: 5 weeks.

850 l/sScreen Capacity
5 weeksOrder-to-dispatch time
Seydioğlu HPP: Trabzon
Seydioğlu HPP: Trabzon · Türkiye
Hydropower · 2019

Seydioğlu HPP: Trabzon

Custom design | 2,500 l/s

At the Seydioğlu HPP (hydropower plant), a complete weir redesign replaced clogged Tyrolean intake structures with custom Coanda screens. The full design of the intake structure was delivered in 8 weeks, eliminating flood-season shutdowns.

2,500 l/sCapacity
Since 2019Operational
Gongele HPP: Antalya
Gongele HPP: Antalya · Türkiye
Hydropower · 2021

Gongele HPP: Antalya

ADENCO-127-1 | 4,424 l/s

28 ADENCO-127-1 screens, including two custom widths of 150 mm and 800 mm, designed to fit two weirs that were cast to the wrong width. CAD modelling and hydraulic analysis based on the US Bureau of Reclamation (USBR) Coanda Design Guide gave a solution without costly reconstruction.

4,424 l/sCapacity
28Intake Screens
BUSKI Muratbey: After the Flood
BUSKI Muratbey: After the Flood · Türkiye
Irrigation · 2017

BUSKI Muratbey: After the Flood

3 x ADENCO-45-1 | 105 l/s

A 105 l/s irrigation intake in the İnegöl hills, fitted with protection bars (stainless steel bars mounted in front of the wedge wire that take the impact of rocks and timber), photographed at commissioning in November 2017 and again ten months later, after a flood had filled the pond behind the weir with rock and sand. The screen was still supplying water.

105 l/sCapacity
10 monthsCommissioning to post-flood inspection
Trabzon: Two Intakes Under Ice
Trabzon: Two Intakes Under Ice · Türkiye
Drinking Water ·

Trabzon: Two Intakes Under Ice

3 x ADENCO-45-1 and 3 x ADENCO-70-0.75 | 105 l/s and 150 l/s

Two mountain drinking-water intakes at two separate sites in Trabzon: one takes 105 l/s through three ADENCO-45-1 screens, the other 150 l/s through three ADENCO-70-0.75 screens, both with protection bars (stainless steel bars mounted in front of the wedge wire that take the impact of rocks and timber). They were photographed in winter, with the pond behind the weir frozen over and snow piled on the screen. At both, water kept passing through the wedge wire beneath the ice.

255 l/sTotal, two intakes
Under iceWater intake continued

Is your intake site similar to these?

Tell us your flow data and the constraints at your intake site. Our engineers respond with a suitable screen configuration in 1-2 business days.